New kitchen cabinetry is in, painting is in process with white above and blue below. That space in the middle is where the new stove will be, with pull-out spice racks on either side! There’s also a dedicated space for trash, directly under the right side of the window.
Happy New Year to everyone!
Our renovation is almost done and, of course, it’s later than expected and a little over budget. What a shock! We have our rental until Jan. 15 and we hope to move back into our home by then. We’ve got lots of cleaning to do!
The next important thing is to get everybody COVID-vaccinated so you can come visit!
Accent tiles have been installed in the shower. Floor tile comes next.Countertops and sinks go here, with a vanity for Leslie on the right side.The washer and dryer will go in the spaces on the left. On the right will be a sink our housekeeper can use, as well as storage space.
Today (Nov. 17) marks four weeks of construction and the new master bathroom is taking shape in our Mexican casa. It may not be quite as large as we expected but it will have two sinks with lighted mirrors, a walk-in shower with a rain-style shower head, and a vanity area for Leslie, with a nice boveda ceiling.
The two orange plastic tubes are for electrical wiring. You can see where the two sinks will be on the north wall, with the shower on the left.
The crew is putting in the plumbing and electrical, which means the floor is still dirt. They’re starting on the new laundry room and the new kitchen, too. We think everything is on schedule.
This is where the shower used to be. Once they level the floor, the washer and dryer will sit side-by-side in this space. There will be a floor sink to the right for our maid to use when mopping the tile floors. This will be where the toilet was.
We’re selecting tile, faucets, fixtures and kitchen appliances now. So many choices!
One huge change has already happened. The new master bathroom and kitchen renovation was Phase One. Changes to the front wall and entry into the courtyard was to be part of Phase Two. But our architect, Juan Allera, proposed doing all the work to the front entrance now because it made sense. I asked how much that would add to the total project. The figure was fairly low because it’s mostly labor, so we gave the green light. Most of the front wall is gone now!
Workers start taking down the front wall of the courtyard.
We still hope to be back in our house by Christmas, but some of the appliances are going to take a few weeks to deliver. Fingers crossed!
More to come as work progresses. Hasta luego!
Once the column on the left comes down, the guys will make everything look great. Then we will put planters on top of the half-walls with plants growing up to increase privacy. We removed the gate and plan to replace it. Design to be determined.
Villamartin 5 in Riviera Alta, an outstanding gated community.
Leslie and I are finally home. After two years of being vagabonds in Europe and The Americas, and 18 months of renting apartments and homes in the Lake Chapala area, we have moved into our house in Ajijic, Jalisco, México.
We have a lot of work to do. First, a complete kitchen remodel. It’s a bit small, so we’re moving the laundry to a space in the master bedroom closet that we don’t really need for clothes. We’ll get a new stackable pair for that location, then move the refrigerator into where the laundry is now. That will open up room for more cabinets and counter space. There’s painting to be done (way too much purple right now) and new plants to add in the garden, and maybe a facelift for the front. But all of that will have to wait until we believe it’s safe to have contractors working in and around the house.
As for the pandemic, our little corner of paradise is no longer virus-free. As of Monday, July 6, there are 32 confirmed and 10 suspected cases in the Chapala municipality (similar to a county in the U.S.), which includes Ajijic. There have been two deaths. The good news is no new cases have been reported to the government in the past few days. There are roughly 50,000 people in the Chapala municipality.
The state government has loosened restrictions somewhat, but face masks are required in grocery stores, banks and other local businesses. Restaurants are allowed to serve dine-in customers as along as there’s adequate separation. We’re still getting food delivered to our house, though.
We’re debating whether to start in-person church services again in August at St. Andrew’s Anglican Church, but it sounds like most of our members are fine with waiting until later in the year. We’ve been doing a Morning Prayer service — Episcopalians will understand that — every Sunday morning on Zoom, and it’s getting better every week. We have anywhere from 30 to 40 people signing in, some from the U.S. and Canada.
New upholstery, new paint job. Church is looking good!
The church is not wasting this time, though. We’ve already had big mirrors removed from the north wall of the sanctuary and the whole sanctuary painted. Instead of pews, we have moveable chairs, and until today they had brown upholstery that looked worn on most. Now they’re all a nice dark blue. We got 175 chairs recovered for 300 pesos each. That’s less than $15 USD each.
It’s rainy season here, so heavy thunderstorms roll through almost every night. If they hit before bedtime, we get to see the light show. If it’s 2 a.m., like many nights, then we roll over and go back to sleep.
I’ll leave you with more photos of our house.
Hasta luego!
The outdoor space is great, with a super view of Lake Chapala looking west, as shown, and also east. We have all our meals out here. Bonus: The mural on the wall was done 10 years ago by local artist Efren Gonzalez. Extra bonus: The chairs swivel!
The kitchen is a little cramped. We have big plans for renovation that will provide more counter space and more cabinets.
A neat bar area. There’s a similar space directly opposite in the dining room. The mirrors make the space look much bigger.
Our living room. Not much of our art is on the walls yet. We hope to have painters come in soon, then we can put up more of our stuff. Did you notice purple here and on the bar area and outside? That’s going away. The sooner the better.