Today (Nov. 17) marks four weeks of construction and the new master bathroom is taking shape in our Mexican casa. It may not be quite as large as we expected but it will have two sinks with lighted mirrors, a walk-in shower with a rain-style shower head, and a vanity area for Leslie, with a nice boveda ceiling.
The two orange plastic tubes are for electrical wiring. You can see where the two sinks will be on the north wall, with the shower on the left.
The crew is putting in the plumbing and electrical, which means the floor is still dirt. They’re starting on the new laundry room and the new kitchen, too. We think everything is on schedule.
This is where the shower used to be. Once they level the floor, the washer and dryer will sit side-by-side in this space. There will be a floor sink to the right for our maid to use when mopping the tile floors. This will be where the toilet was.
We’re selecting tile, faucets, fixtures and kitchen appliances now. So many choices!
One huge change has already happened. The new master bathroom and kitchen renovation was Phase One. Changes to the front wall and entry into the courtyard was to be part of Phase Two. But our architect, Juan Allera, proposed doing all the work to the front entrance now because it made sense. I asked how much that would add to the total project. The figure was fairly low because it’s mostly labor, so we gave the green light. Most of the front wall is gone now!
Workers start taking down the front wall of the courtyard.
We still hope to be back in our house by Christmas, but some of the appliances are going to take a few weeks to deliver. Fingers crossed!
More to come as work progresses. Hasta luego!
Once the column on the left comes down, the guys will make everything look great. Then we will put planters on top of the half-walls with plants growing up to increase privacy. We removed the gate and plan to replace it. Design to be determined.
This is the “before” picture. Lots of changes coming.
The crew has been hard at work since Oct. 20, and the outside walls are almost done for the new master bathroom. The guys should be starting on the plumbing in just a few days. Then the outside work will be finished and they can start converting the bathroom to a laundry room.
Architect Cristina Allera has been working closely with Leslie to make sure we get all the nice touches, like a vanity in the new bathroom where Leslie can sit to do her makeup. Similar to what we had in our Westmont master bath.
Our excellent carpenter, Heriberto, is building the kitchen cabinets in his Guadalajara shop. We’re excited about having more storage space and more counter space.
The foundation of the new bathroom.The window you see will be right over the two sinks. They’ve got about two more feet of wall to build. Eventually we will change the entire facade to get rid of the bars and the purple. That’s next year, though.
Here in Mexico there are no studs and no drywall. All walls are made of brick with cement/stucco over the brick. Trees are hard to come by here — bricks and concrete are cheap and easy. Plus, there’s no reason for termites to invade your home because there’s very little wood.
In another development, we both got Mexican driver’s licenses last week. Leslie’s Illinois license expired on her birthday (Oct. 16). There’s no chance we would go back to the States right now, so the option was to get a license from the state of Jalisco. So we both got brand new licenses, even though my Illinois license is good for a few more years.
We hired someone to get all the paperwork put together, then they walked us over to the license bureau where we took a 10-question test — all about road signs — in English on a computer. Then we got pictures made and in about 15 minutes we had our new licenses.
While the Lakeside area is still not seeing a lot of new COVID cases, the governor of Jalisco has clamped down because hospitalizations statewide are at a critical point. Leslie and I are still doing everything we can to stay safe — even avoiding friends we think are not being careful enough.
I will leave you with a few shots of the hummingbirds and butterflies that hang out in our yard. Our Canadian next-door neighbors Sharon and Quentin have two hummingbird feeders on their back patio. I’ve seen as many as 15 to 20 hummers over there, and most of them pause in our yard to dine on real flowers. They’re fun to watch.
More renovation updates coming! Hasta luego!
We get lots of hummers visiting our yard.Unsure about the name of this butterfly, but we see it a lot. It may be a Giant Swallowtail.