More on the renovation

Sorry it’s been so long since the last post. Leslie and I have both been dealing with health issues that have restricted our movements. Nothing related to the current pandemic, gratefully.

Briefly, we’re both dealing with hip and leg pain caused by pinched nerves. Being limited physically as well as by COVID has been frustrating, but we’re both getting better now and we can refocus on the renovation of our house. As our San Antonio friend Joan used to say, “Gettin’ old ain’t for sissies.”

You saw the new kitchen last post. Now here’s a short video showing the other part of the project. Turn on the sound to get the play-by-play. Basically, we turned the former master bathroom into a laundry room and storage area (which got the washer and dryer out of the kitchen to give us more space there), and added a new bathroom. Enjoy the video!

There’s more to be done, though. New paint inside and outside is important, but we need to pick colors first and we’re not there just yet. We also want to replace all the doors and windows in the house. In most cases, this means simply replacing old black metal frames with white frames, like the new door from the patio into the kitchen. The major work will be replacing the sliding glass door in the front with a “real” door that’s more like other houses in Riviera Alta. We’re thinking of a double door with screened windows on each side that can stay open at night and let cool breezes flow through. It might look something like our home in Illinois. That’s coming later this year — don’t know when.

In other news, Leslie and I are eagerly awaiting our second vaccine jab in the next few days. However, we got the first jab back in mid-March and we’re concerned that it’s been too long since the first installment. So we plan to get an antibody test a few weeks after the second shot. If the results are not adequate, we will head back to the States to get one of the vaccines available there. We know several people who have done that.

Finally, we really hope to be traveling again by the end of this year, if COVID restrictions will allow. There’s a lot more of Mexico for us to explore and to tell you about!

Hasta luego!

The barn swallows have returned to Lakeside. Once again this year, some of them are trying to build a nest on the roll-down shades on our patio. We were able to prevent them from nesting last season and hope to do so again. They are fun to watch, though.

Renovation begins!

Leslie and I are finally getting the renovation started on our house — six months later than planned. We hoped to have all the work done in April and May before we moved in. Because of the quarantine, our homeowner’s association did not allow workers into the neighborhood. Later, when that was allowed, we decided it was not a good idea to have people we don’t know coming into our house. We’re taking extra precautions during this pandemic.

Also, as we’ve lived in our new home, our small project grew bigger. The original plan was to get the washer and dryer out of the kitchen to gain more storage and counter space. We planned to get stackable machines and squeeze them into a space in the master bedroom closet, then update the kitchen cabinets with new doors and buy new appliances.

Over the last four-plus months we’ve started thinking bigger, especially after we found a few issues in the master bath. Now we’re adding a new master bathroom onto the front of the house, reworking and improving the closet and other storage, and putting side-by-side laundry units where the bathroom is now. We will also get a new linen closet and utility closet, neither of which exist now. And we’re gutting the 12-year-old kitchen down to the walls. All new cabinetry, all new appliances, more storage and more counter space.

In fact, the kitchen is already gutted and the bathroom will be gone in a few days. Everything was removed carefully by Fernando, who works as a gardener for at least two of our neighbors. Fernando is building a house for his family in Chapala on a shoestring budget, and he can use all the cabinets and appliances from our house.

We feel fortunate to have hired Juan Alera and his daughter Cristina as our architects. Juan has done home building and renovation for years in the Lakeside area. Cristina studied architecture at the university in Guadalajara (where one of her professors was her father) and for a year at a university in France. She speaks English and French in addition to her native Spanish.

Construction begins Oct. 19. Juan says it will take two months, but we’re allowing for three just in case. And since now we have no kitchen and no master bath, and things are about to get very dusty and dirty, we’ve moved out for the rest of this year. Again, we’re very fortunate to have rented a home right here in our neighborhood, just two streets down the hill. It will be easy to go back and get things we need, and to check on construction progress. We hope to be back in our house before Christmas.

Here are a couple of “before” videos:

Here’s the kitchen before the demolition. Lots of changes coming!
And here’s the master bath and closet.