The second phase of our home renovation has begun. All doors and windows have been replaced and the front entrance has been transformed from black metal sliding glass doors to a standard double door with side panels that open to let the breezes through. The fixed panels are now etched glass with a pattern that matches the windows in the new master bathroom.

Now we can start painting the house inside and outside, which is the second half of Phase 2.
Interior painting should begin by early September. We have chosen a nice neutral color that looks great with our artwork and rugs. The guest suite will be a nice light teal color with darker teal trim. We’re still debating about a color for the master bedroom.
Exterior painting, a nice light blue with white trim, will have to wait until rainy season is over. That’s probably early November. So we hope Phase 2 will be over by Christmas.

What’s next? Probably landscaping. We have a lot to do in the front because all the large plants were removed for the addition of the new bathroom. We also need to redesign the front patio and move the fountain, which right now is in an awkward place directly in front of the main door. Plants in the back are badly overgrown, so we need to look at that too. At some point, I’m hoping to renovate the office area, which doubles as the family room, or TV room. Phase 3 certainly won’t happen until 2022.
More photos below. Hasta luego!