Painting begins

It’s important to patch cracks in the walls before applying paint. This is an outside wall, so water gets into any cracks and creates salitre inside. This is normal in this area, but the repairs should last for several years.

Our home renovation in Mexico continues! Interior painting has started. In about another week, the master bedroom will be pretty much the same color as the new bathroom and the laundry room. That will make the master suite all the same color. The guest bedroom and bath will be a soothing light teal.

But best of all, according to Leslie, is that we’re getting rid of the purple accents in the living/dining room. The main area of our home will be much lighter and brighter, and will accommodate a variety of artwork.

Once the inside has been transformed, Enrique’s crew will start on the outside. We hope everything will be done before the end of the year. Then we’ll turn our attention to the front courtyard and the landscaping.

Hasta Luego!

Phase 2 is underway

New front entrance. The doors are made of perota wood, which is beautiful and resistant to termites.

The second phase of our home renovation has begun. All doors and windows have been replaced and the front entrance has been transformed from black metal sliding glass doors to a standard double door with side panels that open to let the breezes through. The fixed panels are now etched glass with a pattern that matches the windows in the new master bathroom.

Here’s the old front entrance. Sliding glass doors. A friend came to see us once and said, “You don’t have a proper front door.” Now we do.

Now we can start painting the house inside and outside, which is the second half of Phase 2.

Interior painting should begin by early September. We have chosen a nice neutral color that looks great with our artwork and rugs. The guest suite will be a nice light teal color with darker teal trim. We’re still debating about a color for the master bedroom.

Exterior painting, a nice light blue with white trim, will have to wait until rainy season is over. That’s probably early November. So we hope Phase 2 will be over by Christmas.

We had several of these around the house, trying to decide which color to use. We went with the big square on the right for the living/dining area and the office. The exterior will be very similar to the small blue square, upper right.

What’s next? Probably landscaping. We have a lot to do in the front because all the large plants were removed for the addition of the new bathroom. We also need to redesign the front patio and move the fountain, which right now is in an awkward place directly in front of the main door. Plants in the back are badly overgrown, so we need to look at that too. At some point, I’m hoping to renovate the office area, which doubles as the family room, or TV room. Phase 3 certainly won’t happen until 2022.

More photos below. Hasta luego!

The guys had trouble getting the old doors removed, so they ended up working pretty late to get everything installed for us.
New front entrance from the inside. More privacy, classier look.