Feliz Navidad!

Leslie and I will still be in our rental for Christmas. The upgraded kitchen and bathroom projects will apparently go into early January. Hopefully done by Jan. 15. So here are a few more photos of the renovation, along with a Merry Christmas to all!

The kitchen cabinets are in. A deep, single sink goes right under the window, with the new dishwasher in the space just to the left. The stove goes in the slot to the right. And the new window is a solid pane of glass, which offers amazing views of the lake, with a transom that opens to get cool breezes. This is going to be a light, bright kitchen!
Tile is going up in the new shower but they still need to add the decorative tile just above where the tile ends here, and finish the cubbyhole for shampoos and things.
Part of the new closet, with deep drawers and hanging space. There’s a similar space on the other side of the door into the bathroom. Lots of storage space above for suitcases and other things.